
The Bridge River Power Transmission Project
The BC Hydro Bridge River Transmission Project is a project designed to reduce constraints by building redundancy and capacity to off-set peak demands in the

The BC Hydro Bridge River Transmission Project is a project designed to reduce constraints by building redundancy and capacity to off-set peak demands in the

In November 2021, the City of Merritt and the Nicola Valley, experienced a devastating once 1 in a 200-year flood event. The event was one

BLP team members were involved in securing the contract for the London Olympics Program management site restoration project. In consideration of the size and scale of